717-737-2224
 
 

Solar Photovoltic Installations in PA

 
Your Energy Independence. SECCO Powered!
Master Electricians, NABCEP Certified, Seasoned Project Managers,
 
 
  Solar Electric Collectors tax_seminar

Solar Photovoltaic (PV) Energy Systems for Business

Solar Photovoltaic panels convert FREE Sunshine to Electricity! Chances are, you’ve already researched the technology and understand how viable and energizing Solar Systems can be! Two other components of the
Installation are vital – after all, Your Solar System should last 20 to 30 years with minimal maintenance.Solar Electric Collectors

Installation – Properly designed, installed, inspected and wired is a vital part
of every installation. Special training and care must be taken to handle the cable connections properly – since DC voltage is produced by the solar modules. Untrained electricians typical work with AC voltage, which involves more forgiving splices, connections and terminations. Cabling is specially rated to carry DC currents and voltages. Our Installations are supervised by our on-staff NABCEP (North American Board of Certified Energy Practitioners) Professional.

Service – We’re local to the Central PA area and are ready and capable of servicing and maintaining your Solar PV System. We have been trained by the major manufacturers and understand the frustration a Customer feels when the sun is shining and their system is not producing to capacity.

We have the sense of urgency it takes to represent your best interests in the solar business!

PA Sunshine Grant

SECCO is an approved installer of the PA Sunshine Program & we handle all the paperwork, including Application, Utility Interconnection Agreement, Permits, Inspections, Warranty Paperwork and Alternative Energy Credit Submissions.

We make it easy to own a Solar PV System.

Click Here for more details


 
Wattsun Dual-Axis Solar Tracker

Wattsun Dual-Axis Solar Tracker

This Wattsun Dual-Axis Solar Tracker is installed
in Lewisberry, PA where the property owner simply
didn't have enough roof space to install a traditional
roof-mounted Solar PV System. The Wattsun
Dual-Axis Solar Tracker follows the sun all day,
making sure the sun's rays hit the solar panels at
the optimum angle to be most productive.

At the end of the day, when the Wattsun
Tracker has absorbed all the rays, it returns to the
"Good Morning" position and is ready for another day.
The return trip from sunset to sunrise takes less
than 20 minutes and uses very little power to
turn the entire solar array.

This Wattsun Solar Tracker will “track” the path of
the sun throughout the year. As the summer sun is
higher in the sky, the Tracker will flatten-out the array
of high efficiency Sanyo 210 Panels to maintain the
best electrical power output. As the winter sun is
lower in the sky, the Tracker will increase the pitch
of the panels to nearly vertical.

 
   

Dickinson College students give Solar PV
Hands-on training a "thumbs up", as they are
carefully supervised by Matt Wilson.

Dickinson College is a Leader among institutions
in providing Sustainable Living education,
including the Dickinson Farm where a wide
variety of organic farming is performed.

Check out more pictures of Dickinson College
students learning to install Solar Arrays at our
Community Outreach page.

 
Tree House PV Install
   
40 kw Solar Photovoltaic System in Bedford, PA This is a nominal ground-mounted 40 kw Solar
Photovoltaic System installed with a Safety Fence
surrounding the array. This system is in Bedford, PA and
was a referral from an existing Solar Customer. 
   

The SECCO Solar Team installs another Solyndra
Tubular Solar PV System on a slightly pitched standing
seam metal roof of a steel warehouse facility. The
Solyndra panels are built in the Bay Area of California,
USA and are perfect for a Flat Roof when the building
owner is nervous about Roof Penetrations!

The Solyndra Solar PV Panel System interlocks
and is totally self-ballasting without adding a
substantial amount of weight to a roof. As the
snow falls through the Solar PV Tubes and coats
the roof, the Solyndra PV Modules become
more efficient and production increases!

We refer to the Solyndra Solar PV System as a
passive tracking PV System, meaning there are no
moving parts and the properly oriented tubes capture
the morning sun on one side, the noon day sun on the
top and the afternoon sun on the opposite side. A
white roof reflects even more light from under the tubes!

Solyndra Tubular Solar PV System
   
ground-mounted Solar PV System

Brantz demonstrates the accuracy of this
ground-mounted Solar PV System being installed
by our SECCO Solar Team - ironically, to a backdrop
of the industry holding us hostage by raising the
cost of energy.

The Morning Star Market decided " enough is enough"
- we're freezing our Electricity Costs to provide us with sustainable Alternative Energy from the Sun, the most reliable source of energy in our universe!

   

The SECCO Solar Team taking a break from installing
the Solar PV Ground-Mounted System Installation in progress at the Morningstar Market, Rt. 30, York, PA.

These Solar Installers enjoy working in the Sun,
on the ground or on the roof!

Solar Team taking a break
   
Solar Installation Foreman and Master Electrician 

SECCO Solar Installation Foreman and Master
Electrician, Rick Sawyer, takes a break in the Sun!

Rick is the Foreman on many of our large Solar PV Systems, handling all the scheduling, installation coordination – including all the high voltage
electrical interconnections.

Start to Finish, Rick has experience with Solyndra
(no roof penetrations) Solar PV Systems, Schuco Solar
PV Systems, Sunpower Solar PV Systems, Schott Solar Systems and Sanyo Solar PV Systems.

   

The American Flag flies in the wind at the
Morningstar Market off Rt. 30 in York, PA – announcing
the independence their new Solar PV System will be
providing the York Area.

With more Solar Photovoltaic Modules producing power from Alternative Energy sources like Solar & Wind, the United States could someday break the grip the oil
cartels enjoy! Let Independence Ring!

Morning Star Market Place Solar
   
Craig Drabenstadt & Matt Wilson

Master Electrician & NABCEP Certified Matt Wilson & Master Electrician Craig Drabenstadt discuss the electrical wiring and installation techniques of this Thin-Film roll-out Solar PV product, commonly used on Standing Seam Metal Roofs of Pennsylvania Barns and Historic Homes.

This Thin-Film product is produced with adhesive backing, is shipped in roll-form and applies directly to the roof metal for years of trouble-free operation. Thin-film solar PV products perform better at higher temperatures experienced on metal roofing.


   

Yes, we have experience working safely on a Barn roof,
as Luke & Matt team up to install this 30 KW Solar PV System.  Barn roofs are notoriously slick and
somewhat rolling, which tests the Solar Installation
Team to make all the necessary adjustments to
keep the panels straight and true.

It’s important, and often overlooked by
non-electricians, that all the DC electric cables
connecting the panels are tied up and away from
direct contact with the roof. Contact with the roofing materials can damage or cause wear to the cables,
cause production loss and panel failure!

 

we have experience working safely on a barn roof

   

finished 144 solar PV panel array

The finished product! The system consists of 144
Solar PV Panels, controlled by 3 multi-staged Central
Solar PV Inverters, providing the Customer with a
higher level of production and output from the
solar system.

Also, in the unlikely event of a malfunction of any one of
the Central PV Inverters, production will continue from
the other Central PV Inverters.


   

Ross & Matt are completing the Solar PV Canopy
System that allow light to pass through the Solar PV
panels and brighten the area below – great for an
outdoor reading and studying area or simply relaxing
out of the sun, but in the sun’s light – just what the
Students at Dickinson College will appreciate!

solar PV canopy system Dickinson College

   

6 acre racking for 1 megawatt of solar PV system

Project Foreman & Master Electrician, Rick is shown
in the 6 acre field of pile-driven ground mounts,
in preparation for the Solar PV Racking System which
will hold 1 megawatt of Solar PV Panels!

   

Ross demonstrates his years of experience
running farm equipment – looks like he’s
enjoying it a little too much!

Ross demonstrates his years of experience

   

Journeyman Electrician Kathy perfectly aligns the posts for a solar PV system

Kathy, Journeyman Electrician, is all smiles as she
works through the exacting details to keep the posts perfectly aligned and ready for the rail system that will
hold the Solar PV panels.

You’ll notice the concrete base installed wherever the
pile-driven posts didn’t pass the “pull-out” test.


   

Ironman & Master Electrician, Tony says we’re ready
for the racking system to hold the FOUR THOUSAND
THREE-HUNDRED Solar PV Panels that will rest
on these pile-driven posts!

This 12 year SECCO veteran has been enjoying being
an Electrician for over 35 years! Just try & keep up with him, you’ll understand why we call him the Ironman!

Master Electrician Tony ready for the racking system to hold four thousand three hundred solar panels

   

large solar projects call for heavy equipment

A large Solar PV Project calls for some heavy-duty
equipment to help move the PV Array mounting
and racking materials .

 

Aerial view drawing of a Solar Photovoltaic (PV)
Generating Facility detailing the PV Array installed
by the SECCO Solar PV Team. The project consists
of more than 4,300 Solar PV Panels installed on
ground mounted arrays that follow the contour of the
farmland, blending into the landscape.

This new Solar PV "Farm" will become a generating
facility, reducing the area's overall dependence on
polluting forms of fossil fuel, like natural gas, wood
and oil, and reducing the area's carbon footprint.

Along with the Solar PV System, the SECCO Team
of Master Electricians installed High Voltage
electrical systems to connect the Solar PV arrays
to the Utility Grid.

4300 solar panels installed on ground mounted arrays on farmland

   

Syntek Solar Panel

SECCO Solar Installers install grounding system
on an elevated-rail, self-ballasted system on a
flat roof in Carlisle, PA.

   

SECCO Co-Workers review a self-ballasted Solar PV System prior to completion in Carlisle, Cumberland County, PA. The tubular Solar PV Panels act as
“passive solar trackers” absorbing solar energy as
the sun moves across the sky.

tubular solar photovoltaic system in Carlisle PA
   
Self-ballasted system

This self-ballasted Solar PV System leaves just
enough room for this worker to access the
connections from underneath.

Elevating the Solar PV System above the flat roof also enables snow to drop between the solar tubes, eliminating the significant solar electric loss a flat panel solar system would encounter. Snow under the Solar PV System actually increases the production of the system, as the sun’s rays are reflected back to the PV tubes.

   

100 Kw Tubular PV Array on Carlisle rubber roof
system increases system productivity - Qualifying
the roofing as part of the PV System.

As part of the PV Energy System, the new roofing can
use the same depreciation schedule and qualifies
for the 30% Federal Tax Credit as an integral component of the Solar PV System, claiming substantial tax advantages to the building Owner!

100 Kw Tubular PV Array on Carlisle rubber roof system
   
220 Kilowatts

220 Kw Tubular PV Array in Mechanicsburg, PA
craned into position for installation crews. Over
1,200 tubular Solar PV panels strategically placed
on the roof structure, to make sure the roofing
system integrity is maintained.

Extra care is exercised to make sure the crews
moving the panels into position protect the roofing membrane from any possible damage.

   

SECCO Solar Installers on an 80 Kw System in Lemoyne, PA. Keeping over 400 solar panels properly spaced and in symmetrical rows takes time and care.

Additional care is taken to keep all wiring off the roof surface allowing free flowing rain water to run under the panels without wearing the insulation off the wiring.

Elevating the Solar PV panels above the metal roof
surface also helps to keep the solar panels cool,
maximizing summer solar electric production.

80 Kw Photovoltaic Solar System in Lemoyne PA
   
80 Kw Flat Panel Solar PV System in Lemoyne PA

SECCO Solar PV Installers, including Master Electricians, put the finishing touches on this grid-tied Solar PV system.

Electricity produced by this PV System will feed back
into the PPL Electric grid, helping to offset the needs
for the utility to produce electricity from fossil fuel
sources; oil, diesel fuel & gas.

   

SECCO Solar & Electrical Construction Foreman
Rick Sawyer is pleased to have this heavy Central
PV Inverter unit rigged into place and connected
to the Electric System.

Keeping a large project on schedule while
communicating with the Owner of an operational
facility is an important part of retrofitting a facility with
Solar PV Electric Power, as electricity service
interruptions must be kept to a minimum.

80 Kw Solar PV Inverter in Lemoyne PA
   
PV Array in Yellow Creek State Park in Pennsylvania
SECCO Solar Intern building a pole-mounted
PV Array in Yellow Creek State Park in Pennsylvania.
   
SECCO Solar Installer makes an adjustment
to solar array in Carlisle, PA. Journeyman Electrician,
Matt, understands the importance of sound electrical wiring connections. While solar panels are sometimes thought of as “plug & play”, poor electrical connections degrade the Solar PV System performance while
going un-noticed.
Solar Installer makes an adjustement to solar array in Carlisle PA
   
3KW photovoltaic solar installation at the PA Energy Store in Lemoyne PA
3KW photovoltaic solar installation at the
PA Energy Store in Lemoyne, PA. This 30' x25'
solar array is visible from RT. 581.
   

SECCO Solar Installer uses a Solar Pathfinder
to determine the orientation of a photovoltaic
solar array for the PA Energy Store.

Solar Path Finder
   
3KW solar photovoltaic installation at the Blue Chip Federal Credit Union

This 3KW Photovoltaic Solar installation will outlast
the new roof that was being applied to the Blue Chip
Federal Credit Union

 
 

 

 
   
 

7 Ways SECCO's Commercial Solar Energy is Affordable!

  1. 30% Federal Tax Credit

  2. System Qualifies as SEC. 179 Equipment

  3. 5 Year Depreciation Schedule

  4. SREC's Generate Revenue

  5. Freeze Your Electricity Costs!

  6. Special Loans

  7. Power Purchase Agreements